ISTQB CTFL
Static testing and reviews
Easy
Static testing basics
- What applies to the test object in static testing?
- Which work product can be reviewed?
- What does a work product need for static analysis to be possible?
- Which defect does static testing find that dynamic testing hardly detects?
- How does static testing find defects?
- Which quality characteristic can be assessed well statically?
- Why are overall project costs usually lower with reviews than without?
Feedback and review process
- Which standard describes a generic review process?
- Which review process activity comes first?
- What happens in the individual review?
- Which role creates the work product and fixes it?
- Which role ensures review meetings run effectively?
- Which role collates anomalies and records decisions?
- Which role decides what is reviewed and provides staff and time?
- Which review type is the most formal?
- Who leads a walkthrough?
- What characterises an informal review?
- What should never be an objective of a review?
- Why should reviews be limited to small chunks?
- What is the benefit of early and frequent stakeholder feedback?
Medium
Static testing basics
- Which work products can be tested statically?
- Which statements about the value of static testing are correct?
- What is static analysis used for besides finding code defects?
- Which defects are easier or cheaper to find through static testing?
- Which statements about the relationship between static and dynamic testing are correct?
- Why does static testing find defects on rarely executed code paths more easily?
- Which tools also count as static analysis?
Feedback and review process
- What consequences can low stakeholder involvement during development have?
- What is defined when planning a review?
- What is the goal of review initiation?
- What happens in the communication and analysis activity?
- What belongs to the fixing and reporting activity?
- What is the task of the review leader?
- Which objectives can a walkthrough pursue?
- Which statements about inspections are correct?
- What does the required level of formality of a review depend on?
- Which factors contribute to successful reviews?
- Who can take on the role of reviewer?
- What is the main objective of an informal review?
- Who leads a technical review?
Hard
Feedback and review process
- For the software of a pacemaker programming station the regulator demands traceable evidence for every review. Which review type fits best?
- Two architects disagree on whether a service should process messages synchronously or asynchronously. A moderator leads a meeting of technically qualified reviewers to reach a decision. Which review type is this?
- An author presents her data model to new team members, explaining it step by step and collecting questions; the listeners did not prepare. Which statements are correct?
- In an inspection the author of a module wants to act as scribe at the same time to save time. How should this be assessed?
- A company counts review findings per author and uses them in staff appraisals. Since then authors rarely submit drafts for review. Which success factors are violated?
- A 180-page requirements specification is to be reviewed in a single three-hour meeting without preparation time. Which improvements are appropriate?
- In a review meeting it turns out that a reported "contradiction" is not one, because the reviewer had read an outdated version. Which statements are correct?
- Assign the activity: a reviewer reads a module's code using a checklist and notes twelve findings. Which activity is this?
- A team shows its client a first version only after six months; the client barely recognises the requirements. What would early, frequent feedback have achieved?
- A requirements document is first read informally by a colleague and later, shortly before signing the contract, formally inspected. How should this be assessed?
- Assign the roles: who decides whether a concept is reviewed at all and how many person-days are available, and who decides who takes part and when the meeting takes place?
- For a short configuration script a team chooses a full inspection with six people. Which success factor is least respected?
- Which statement about the level of formality and the review process activities is correct?
- After a review meeting four severe defects are still open; the exit criteria require zero. What follows in the review process?
- In a review meeting two experienced developers regularly talk over the junior reviewer, who therefore stops speaking. Which role is particularly called for here?
Static testing basics
- Which defects should a team rather look for with static than with dynamic testing?
- A tool reports that a variable is used before a value has been assigned to it. Which statements are correct?
- A tester, product owner and developer jointly refine user stories for a loyalty programme and check whether the acceptance criteria are testable. What is correct?
- Which statements accurately describe the use of static analysis in a team using continuous integration?
- Which statement about static testing and validation is correct?