ISTQB CTFL

Static testing and reviews

60 questions

Easy

Static testing basics

  1. What applies to the test object in static testing?
  2. Which work product can be reviewed?
  3. What does a work product need for static analysis to be possible?
  4. Which defect does static testing find that dynamic testing hardly detects?
  5. How does static testing find defects?
  6. Which quality characteristic can be assessed well statically?
  7. Why are overall project costs usually lower with reviews than without?

Feedback and review process

  1. Which standard describes a generic review process?
  2. Which review process activity comes first?
  3. What happens in the individual review?
  4. Which role creates the work product and fixes it?
  5. Which role ensures review meetings run effectively?
  6. Which role collates anomalies and records decisions?
  7. Which role decides what is reviewed and provides staff and time?
  8. Which review type is the most formal?
  9. Who leads a walkthrough?
  10. What characterises an informal review?
  11. What should never be an objective of a review?
  12. Why should reviews be limited to small chunks?
  13. What is the benefit of early and frequent stakeholder feedback?

Medium

Static testing basics

  1. Which work products can be tested statically?
  2. Which statements about the value of static testing are correct?
  3. What is static analysis used for besides finding code defects?
  4. Which defects are easier or cheaper to find through static testing?
  5. Which statements about the relationship between static and dynamic testing are correct?
  6. Why does static testing find defects on rarely executed code paths more easily?
  7. Which tools also count as static analysis?

Feedback and review process

  1. What consequences can low stakeholder involvement during development have?
  2. What is defined when planning a review?
  3. What is the goal of review initiation?
  4. What happens in the communication and analysis activity?
  5. What belongs to the fixing and reporting activity?
  6. What is the task of the review leader?
  7. Which objectives can a walkthrough pursue?
  8. Which statements about inspections are correct?
  9. What does the required level of formality of a review depend on?
  10. Which factors contribute to successful reviews?
  11. Who can take on the role of reviewer?
  12. What is the main objective of an informal review?
  13. Who leads a technical review?

Hard

Feedback and review process

  1. For the software of a pacemaker programming station the regulator demands traceable evidence for every review. Which review type fits best?
  2. Two architects disagree on whether a service should process messages synchronously or asynchronously. A moderator leads a meeting of technically qualified reviewers to reach a decision. Which review type is this?
  3. An author presents her data model to new team members, explaining it step by step and collecting questions; the listeners did not prepare. Which statements are correct?
  4. In an inspection the author of a module wants to act as scribe at the same time to save time. How should this be assessed?
  5. A company counts review findings per author and uses them in staff appraisals. Since then authors rarely submit drafts for review. Which success factors are violated?
  6. A 180-page requirements specification is to be reviewed in a single three-hour meeting without preparation time. Which improvements are appropriate?
  7. In a review meeting it turns out that a reported "contradiction" is not one, because the reviewer had read an outdated version. Which statements are correct?
  8. Assign the activity: a reviewer reads a module's code using a checklist and notes twelve findings. Which activity is this?
  9. A team shows its client a first version only after six months; the client barely recognises the requirements. What would early, frequent feedback have achieved?
  10. A requirements document is first read informally by a colleague and later, shortly before signing the contract, formally inspected. How should this be assessed?
  11. Assign the roles: who decides whether a concept is reviewed at all and how many person-days are available, and who decides who takes part and when the meeting takes place?
  12. For a short configuration script a team chooses a full inspection with six people. Which success factor is least respected?
  13. Which statement about the level of formality and the review process activities is correct?
  14. After a review meeting four severe defects are still open; the exit criteria require zero. What follows in the review process?
  15. In a review meeting two experienced developers regularly talk over the junior reviewer, who therefore stops speaking. Which role is particularly called for here?

Static testing basics

  1. Which defects should a team rather look for with static than with dynamic testing?
  2. A tool reports that a variable is used before a value has been assigned to it. Which statements are correct?
  3. A tester, product owner and developer jointly refine user stories for a loyalty programme and check whether the acceptance criteria are testable. What is correct?
  4. Which statements accurately describe the use of static analysis in a team using continuous integration?
  5. Which statement about static testing and validation is correct?

Certifications & exams

Which exam comes next?

You can already practise for 51 exams, and 16 are up for a vote. See all certifications with their official information, cast your vote or suggest your exam.

See all certifications