Acceptance criteria · Question 55 of 60

Which acceptance criteria test intervenability?

2 answers are correct. Hard

Show answer

Answer

  • B An engineer can veto critical AI actions in the power grid within a 30-second window before execution
  • D A production line can be shut down within 0.5 seconds when a robot breaches its safety zone

Explanation

Shutting down the production line and the veto window in the power grid test intervenability. Both serve to let an operator intervene in a timely manner to prevent harm. Taking control of the drone belongs to user controllability, and the version identifier to transparency.

Certifications & exams

Which exam comes next?

You can already practise for 19 exams, and 21 are up for a vote. See all certifications with their official information, cast your vote or suggest your exam.

See all certifications